Build a Critical Path Schedule in Minutes — No Installation Required

A free CPM tool for students, engineers, and planners: build your schedule, find the critical path, calculate total and free float, and export a professional PDF report.

Free to use Browser-based PDF reports

Activities

ID Description Dur (d) Predecessors
Predecessors accept relationship types and lag, e.g. A, A:SS, B:FF+2, C:FS-1. Bare IDs default to FS with zero lag. Separate multiple with commas.

Network diagram

Critical path Has float Critical activity (TF ≤ 0) Non-critical

Schedule results

IDDescription DurESEFLSLF Total floatFree floatStatus

Schedule narrative